CHIII Colocation Data Center | Elk Grove Village, Illinois | 2007

Sheehan Partners provided comprehensive architectural design services for construction of this colocation data center. The three story facility is planned with major electrical equipment and a central utility plant on the fi rst fl oor serving up to 3,400 cabinets on the second and third fl oors. The building is designed around three stand alone planning modules, each of which can be scaled as required to serve customer demand. The precast concrete frame allowed for rapid construction, while the precast exterior provides for economical, secure enclosure. Insulated glass curtainwall is provided at all offi ce areas and at commonly used circulation paths such as stairs. The project was designed, constructed and commissioned for occupancy in eighteen months.

This design was recognized by the Chicago Chapter AIA with a 2008 Distinguished Building Award. Area: 285,000 sf Status: Completed 2007‚Äč